top left corner top middle frame top right corner
left_bar
Magnet Logo
spacer
Contact | Demo | Company  
spacer
top
spacer spacer spacer
top spacer
 

 
Solutions > Planning and Projects
line

MAGNET's planning and projects functionality is closely tied to custom work flows. In a development case, as with other records in MAGNET, you can add an association to any element in the system, be it a permit, inspection, violation, fees, fines etc., all on a case by case basis. The true power of the planning module can be realized by defining the intricacy, timing, and dependencies of these relationships through a work flow.

As mentioned in the work flow section, this organization can be simple and streamlined, or as deep and complex as needed. The interface used to create work flows follows a step-by-step wizard which makes definition of project requirements and milestones an easy task. It also easily handles the most elaborate scenarios you encounter.

  • Automatic Planning Staff Meeting queuing
  • City Inspections, Engineering, Traffic Services, Parks & Recreation, Department of Transportation, PWC & various other departments notified of new documents to review
  • Plan review personnel access plan documents online, make comments and create additional conditions (if required) for final approval
  • Track status of department reviews
  • Automatically notify concerned parties of review results

 

right bar
 
footer top footer top footer top footer top footer top
footer side MAGNET: Municipal Automation & Geographic Network
100 Highpoint Drive, Suite 104 | Chalfont, PA 18914 Main: 215.822.9100 Fax: 215.822.9494
line divider
MAGNET is developed and supported by
Computer Software, Inc. (CSI),
© Copyright 2009 . All Rights Reserved
CSI Computer Software, Inc
footer side
 
left bottom corner bottom piece right bottom corner
Magnet Site Map: Solutions | Features | The Process | Company